Case Study Sectors
Hospital Boiler Replacement
Hospital Boiler Replacement
EMS were approached to help with a boiler replacement at a hospital with minimum disruption to the services to patients that the building carries out.
Read Case StudyBody Store Replacement
Replacement of body store at major Hampshire hospital
This major hospital serving hundreds of patients asked us to take a look at one of their existing body stores. We found that the current body store was beyond repair with failing doors and seals which had started to effect its performance. The body store needed replacing.
Read Case StudyAndover Refrigeration Cold Room
A new refrigeration cold room in Andover
This client is a large growing retailer of fruit and veg in the U.K. Due to expansion they came to us looking for a company that could provide them with a refrigeration cold room for their facilities in AndoverWe needed to provide the client with a refrigeration cold room, which needed to be maint
Read Case StudyGolf club air conditioning
Creating The Perfect Ambience For Guests
This popular golf club set in beautiful grounds required a replacement for their old comfort cooling equipment in their dining room used by guests for special events and meetings.
Read Case StudyHVAC Gym Install
Brand new gym HVAC design and install
We were approached by the contractors, Lancer Scott, to quote for the design and installation of a heating and cooling system for a new gym opening in Bristol.
Read Case StudyAHU Replacement
Helping manufacturer avoid risk to air quality
We were asked to project manage the replacement of an air handling plant for this large manufacturer. A number of AHU's (Air Handling Units) were now beyond refurbishment and represented a risk to the air quality within the company's production areas. Due to the nature of the product this was not so
Read Case StudyLecture Theatre Refurb
Creating The Optimum Temperature For Learning
During routine maintenance at a university, EMS noticed that the AHU's providing ventilation to a lecture theatre would soon need replacing. We advised the university of this and planned in the replacement which would include additional benefits to the students and staff.
Read Case StudyIndustrial Cross Head Forge Cooling
Keeping Cool Under Fire
This Hereford manufacturer asked us to take a look at their cooling system which was starting to cause them issues. Their cross head forge was being cooled by a conventional ducted unit and condensing unit were mounted on a common mobile chassis.
Read Case StudyAndover Bakery Production Facility
Rising to the challenge with a brand new HVAC system
EMS were approached by a project manager on behalf of a global provider of premium bakery products to design a HVAC system for its new 10,000m² production facility in Andover.
Read Case StudyCall Centre Air Conditioning
Fabric Duct Solution for Call Centre Air Conditioning
A call centre required a new air conditioning system that would cause less cold draughts and be quieter when in use.
Read Case StudyWarehouse Cooling
Critical warehouse cooling supply requirement
We were contacted by a pharmaceutical who required a cooling system for their warehouse facility. Due to the medical nature of the products being packaged and stored many factors needed to be taken into consideration when designing a suitable cooling system for the company.
Read Case StudyAll Inclusive Maintenance
Optimum efficiency maintenance contract
Our customer, a market leader in the manufacture of healthcare products in Southampton, has a large quantity of air conditioning and process cooling systems serving business critical production areas operating 24/7. Minimising breakdowns, and therefore downtime, is a crucial factor in maximising the
Read Case StudyMetal Production Maintenance
Maintenance Contract Looking after 300 Air Conditioning Systems
By switching service provider for their air conditioning equipment, this manufacturer based in Hereford achieved year on year reduction in costs.
Read Case StudyCOVID Secure Ventilation
Supporting Staff Returning to the Office
EMS designed and installed a ventilation system to reduce the risks of COVID for staff returning to the office.
Read Case StudyCondenser Replacement
Maximising Efficiency and Reducing Downtime
A manufacturer with business critical equipment needed to replace their condensers to ensure that downtime of their production plant was kept to a minimum.
Read Case StudyOnline Portal Solution
Instant access to equipment and maintenance information
A Hampshire college benefited from a new contract with EMS which included the use of an online customer portal giving them easier access to the information they needed regarding their HVAC equipment.
Read Case StudyOffice Comfort Cooling
Air Conditioning and Ventilation for new office complex
EMS Ltd were asked to design and install a new comfort cooling system for a new office complex within an existing factory.
Read Case StudyEvaporative Coolers
Evaporative Cooling for Pharmaceutical
We provided this contract packaging company an evaporative cooling system to ensure the drugs which they store for their clients are kept in a controlled environment of between 15oC and 25oC all year round.
Read Case StudyData centre Fit-out
Data Centre Fit-out
EMS successfully tendered to provide full "turnkey" services for a company in Plymouth who were extending their data centre.
Read Case StudyCardiff Server Room Fit-Out
Server Room Fit Out in Cardiff
EMS installed close control air conditioning as part of a server room fit out in Cardiff for a major automobile company.
Read Case StudyLaser Production Facility
Full refurbishment for a newly purchased premises
EMS Ltd were employed by a world-leading global manufacturer of fibre lasers based in Hampshire to provide a comprehensive mechanical solution on a design and build basis. This would be part of a full refurbishment of their newly-purchased 1,900m2 premises. EMS established, over a period of several.
Read Case StudyHereford Plant Room Boiler Replacement
Three new boilers for Hereford College
A college based in Hereford needed their boilers replacing, EMS came up with a plan which meant minimum disruption and downtime for students and staff.
Read Case StudyHVAC Maintenance Reporting
Maintenance Reporting for Gloucestershire Manufacturer
Our client is a large manufacturer of electrical components, based in Gloucestershire. In December 2017, EMS Ltd were honoured to be awarded the maintenance contract for all their air conditoning equipment on site. Their full asset register comprises over 500 air conditioning systems across 11 sites
Read Case StudyProcess Cooling Chiller
Process cooling for laser manufacturer
Our customer, a world leading manufacturer of fibre lasers based in Hampshire, required additional process cooling for a new production unit within their existing facility. The requirement was to provide a cooling capacity for the 30 production lasers used in the process.
Read Case Study