toolvector pdftelephone-handle-silhouetteback-to-topdownload-to-storage-drivedownloadquoteadd

Case Study Sectors

Hospital Boiler Replacement
Healthcare

Hospital Boiler Replacement

Hospital Boiler Replacement

EMS were approached to help with a boiler replacement at a hospital with minimum disruption to the services to patients that the building carries out.

Read Case Study
Healthcare

Body Store Replacement

Replacement of body store at major Hampshire hospital

This major hospital serving hundreds of patients asked us to take a look at one of their existing body stores. We found that the current body store was beyond repair with failing doors and seals which had started to effect its performance. The body store needed replacing.

Read Case Study
Manufacturing

Andover Refrigeration Cold Room

A new refrigeration cold room in Andover

This client is a large growing retailer of fruit and veg in the U.K. Due to expansion they came to us looking for a company that could provide them with a refrigeration cold room for their facilities in AndoverWe needed to provide the client with a refrigeration cold room, which needed to be maint

Read Case Study
Golf Club
Leisure

Golf club air conditioning

Creating The Perfect Ambience For Guests

This popular golf club set in beautiful grounds required a replacement for their old comfort cooling equipment in their dining room used by guests for special events and meetings.

Read Case Study
Leisure

HVAC Gym Install

Brand new gym HVAC design and install

We were approached by the contractors, Lancer Scott, to quote for the design and installation of a heating and cooling system for a new gym opening in Bristol.

Read Case Study
Manufacturing

AHU Replacement

Helping manufacturer avoid risk to air quality

We were asked to project manage the replacement of an air handling plant for this large manufacturer. A number of AHU's (Air Handling Units) were now beyond refurbishment and represented a risk to the air quality within the company's production areas. Due to the nature of the product this was not so

Read Case Study
Education

Lecture Theatre Refurb

Creating The Optimum Temperature For Learning

During routine maintenance at a university, EMS noticed that the AHU's providing ventilation to a lecture theatre would soon need replacing. We advised the university of this and planned in the replacement which would include additional benefits to the students and staff.

Read Case Study
Manufacturing

Industrial Cross Head Forge Cooling

Keeping Cool Under Fire

This Hereford manufacturer asked us to take a look at their cooling system which was starting to cause them issues. Their cross head forge was being cooled by a conventional ducted unit and condensing unit were mounted on a common mobile chassis.

Read Case Study
Manufacturing

Andover Bakery Production Facility

Rising to the challenge with a brand new HVAC system

EMS were approached by a project manager on behalf of a global provider of premium bakery products to design a HVAC system for its new 10,000m² production facility in Andover.

Read Case Study
Call Centre Air Conditioning
Offices

Call Centre Air Conditioning

Fabric Duct Solution for Call Centre Air Conditioning

A call centre required a new air conditioning system that would cause less cold draughts and be quieter when in use.

Read Case Study
Pharmaceutical

Warehouse Cooling

Critical warehouse cooling supply requirement

We were contacted by a pharmaceutical who required a cooling system for their warehouse facility. Due to the medical nature of the products being packaged and stored many factors needed to be taken into consideration when designing a suitable cooling system for the company.

Read Case Study
Manufacturing

All Inclusive Maintenance

Optimum efficiency maintenance contract

Our customer, a market leader in the manufacture of healthcare products in Southampton, has a large quantity of air conditioning and process cooling systems serving business critical production areas operating 24/7. Minimising breakdowns, and therefore downtime, is a crucial factor in maximising the

Read Case Study
Manufacturing

Metal Production Maintenance

Maintenance Contract Looking after 300 Air Conditioning Systems

By switching service provider for their air conditioning equipment, this manufacturer based in Hereford achieved year on year reduction in costs.

Read Case Study
Offices

COVID Secure Ventilation

Supporting Staff Returning to the Office

EMS designed and installed a ventilation system to reduce the risks of COVID for staff returning to the office.

Read Case Study
Condenser
Manufacturing

Condenser Replacement

Maximising Efficiency and Reducing Downtime

A manufacturer with business critical equipment needed to replace their condensers to ensure that downtime of their production plant was kept to a minimum.

Read Case Study
Education

Online Portal Solution

Instant access to equipment and maintenance information

A Hampshire college benefited from a new contract with EMS which included the use of an online customer portal giving them easier access to the information they needed regarding their HVAC equipment.

Read Case Study
Offices

Office Comfort Cooling

Air Conditioning and Ventilation for new office complex

EMS Ltd were asked to design and install a new comfort cooling system for a new office complex within an existing factory.

Read Case Study
Evaporative Coolers
Pharmaceutical

Evaporative Coolers

Evaporative Cooling for Pharmaceutical

We provided this contract packaging company an evaporative cooling system to ensure the drugs which they store for their clients are kept in a controlled environment of between 15oC and 25oC all year round.

Read Case Study
Data centre fit-out
Data Centres

Data centre Fit-out

Data Centre Fit-out

EMS successfully tendered to provide full "turnkey" services for a company in Plymouth who were extending their data centre.

Read Case Study
Data Centres

Cardiff Server Room Fit-Out

Server Room Fit Out in Cardiff

EMS installed close control air conditioning as part of a server room fit out in Cardiff for a major automobile company.

Read Case Study
Manufacturing

Laser Production Facility

Full refurbishment for a newly purchased premises

EMS Ltd were employed by a world-leading global manufacturer of fibre lasers based in Hampshire to provide a comprehensive mechanical solution on a design and build basis. This would be part of a full refurbishment of their newly-purchased 1,900m2 premises. EMS established, over a period of several.

Read Case Study
Education

Hereford Plant Room Boiler Replacement

Three new boilers for Hereford College

A college based in Hereford needed their boilers replacing, EMS came up with a plan which meant minimum disruption and downtime for students and staff.

Read Case Study
Manufacturing

HVAC Maintenance Reporting

Maintenance Reporting for Gloucestershire Manufacturer

Our client is a large manufacturer of electrical components, based in Gloucestershire. In December 2017, EMS Ltd were honoured to be awarded the maintenance contract for all their air conditoning equipment on site. Their full asset register comprises over 500 air conditioning systems across 11 sites

Read Case Study
Process cooling chiller
Manufacturing

Process Cooling Chiller

Process cooling for laser manufacturer

Our customer, a world leading manufacturer of fibre lasers based in Hampshire, required additional process cooling for a new production unit within their existing facility. The requirement was to provide a cooling capacity for the 30 production lasers used in the process.

Read Case Study

Contact Us

Speak with our sales team

01432 340 800 Contact us